psl195 RMVs and alternate equivalent technology must be put in in accordance with the subsequent requirements:

Operators of transportation pipelines around the Outer Continental Shelf should determine on all their respective pipelines the particular factors at which working responsibility transfers to a producing operator. For those scenarios wherein the transfer points are not identifiable by a resilient marking, Every single operator will have right until September 15, 1998 to identify the transfer factors. If It's not at all practicable to durably mark a transfer level as well as the transfer point is found previously mentioned drinking water, the operator need to depict the transfer issue over a schematic maintained near the transfer position.

Pipe connected with tie-ins have to be strain examined, both With all the segment being tied in or individually.

(2) Checking variations from usual Procedure just after irregular operation has finished at ample vital areas in the technique to determine continued integrity and Risk-free Procedure.

(three) On pipe made up of a longitudinal weld, the longitudinal weld needs to be as near as practicable on the neutral axis of your bend Except—

indicates an aquifer that's composed of limestone or dolomite in which the porosity is derived from connected Answer cavities. Karst aquifers are frequently cavernous with large prices of move.

(b) No operator might allow the force in the pipeline during surges or other variants from typical functions to exceed one hundred ten % of the running stress Restrict set up underneath paragraph (a) of this part.

An operator have to build 5-year intervals, never to exceed sixty eight months, for regularly assessing the road pipe's integrity. An operator ought to foundation the assessment intervals on the chance the road pipe poses into the high consequence area to ascertain the priority for assessing the pipeline segments.

(b) The operator's plan should adhere to the final method recommendations of API RP 1162 and evaluate the one of a kind attributes and properties with the operator's pipeline and facilities.

This portion relates to onshore line pipe that may accommodate inspection by way of in-line inspection equipment and is not matter on the integrity management demands in § 195.452.

(a) Every aboveground breakout tank must be built and made to withstand The interior stress made by the hazardous liquid to be stored therein and any expected external hundreds.

(e) Consider an individual When the operator has reason to feel that the individual is now not experienced to carry out a included process;

(four) Techniques that needs to be taken for community security within the occasion of the dangerous liquid or carbon dioxide pipeline release; and

(d) In the course of development, at least 10 % on the girth welds created by each welder and welding operator in the course of Just about every welding working day needs to be nondestructively analyzed over the whole circumference in the weld.